(WXYZ) — Drivers who take Lahser will have to deal with road construction for a little while longer, after a car drove into fresh concrete.
The road has been under construction following an water main break.
According to the Oakland County Road Commission's Twitter account, the concrete needs to be ripped out and replaced again.
The NB Lahser pavement repair from the water main break north of 8 Mile was going well until a driver decided to go around barricades. The concrete will be ripped out and poured again. Yes, the driver got several tickets & his insurance will be billed to fix the artwork. SMH pic.twitter.com/gX6IKpr3CV
— Oakland County Roads (@oaklandroads) January 30, 2020